Difference between revisions of "CCDA - en/Viborg Kommune"

From Teknologisk videncenter
Jump to: navigation, search
m (Supplementary information)
m
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
= Viborg kommune =
+
= Viborg municipality (kommune) =
 
{|
 
{|
 
|[[Image:Viborg1.png|left|800px|thumb|Viborg kommune]]
 
|[[Image:Viborg1.png|left|800px|thumb|Viborg kommune]]
Line 7: Line 7:
 
The new town hall in Viborg are 20.000m<sup>2</sup> and have approx. 800 employers.  
 
The new town hall in Viborg are 20.000m<sup>2</sup> and have approx. 800 employers.  
  
The council wants a written report covering their new network considering redundancy, security and estimated network speeds.
+
The council wants a new network and would like a written report covering their new network considering redundancy, security and estimated network speeds.
  
= Facts: Viborg kommune =
+
= Facts: Viborg municipality =
 
*94.333 residents (2013)
 
*94.333 residents (2013)
 
*Area 1.422 km<sup>2</sup> - 3,3% of Denmark
 
*Area 1.422 km<sup>2</sup> - 3,3% of Denmark
Line 19: Line 19:
 
*21 College schools
 
*21 College schools
 
*16 care centers
 
*16 care centers
<ref>http://www.viborg.dk/db/Kommune.nsf/Alle/9477EDB57BEB5E58C12572E600217769?OpenDocument</ref>
+
 
  
 
== Exercise details ==
 
== Exercise details ==
*'''NOTE:''' Some of the information about Viborg Community are fabricated, and don't reflect the councils actual network.[[User:Heth|Henrik Thomsen]]
+
*'''NOTE:''' Some of the information about Viborg municipality are fabricated, and don't reflect the councils actual network.[[User:Heth|Henrik Thomsen]]
  
 
=== Phase 1 ===
 
=== Phase 1 ===
*Closed network to Kommunedata (Estimated 50 Mbps. Uses MPLS)
+
*Closed network to Kommunedata (Estimated 50 Mbps. Uses MPLS) (Kommunedata is a common data center for all danish municipalityes)
 
*All employees has access to mail using Outlook or using WEB-mail
 
*All employees has access to mail using Outlook or using WEB-mail
 
*Want's to use IP telephony
 
*Want's to use IP telephony
Line 43: Line 43:
 
*Connection of schools and all other institutions.
 
*Connection of schools and all other institutions.
 
== Supplementary information==
 
== Supplementary information==
To solve the exercise you need to make a needs analysis of Viborg Kommunes needs and demands. Ask your teacher.
+
To solve the exercise you need to make a needs analysis of Viborg municipality needs and demands. Ask your teacher.
 
*Information about Service providers
 
*Information about Service providers
 
**TDC: [http://www.tdc.dk TDC homepage] - Ask your teacher.
 
**TDC: [http://www.tdc.dk TDC homepage] - Ask your teacher.
**EnergiMidt [http://http://www.energimidt.dk EnergiMidts hjemmeside]<ref>http://www.energimidt.dk/Erhverv/Fiberbredbaand/Kommuner/Sider/Fiberbredbaand-til-kommuner.aspx</ref> - Ask your teacher.
+
 
*Netværksprodukter
+
*Network products
 
**Cisco [http://www.cisco.com Ciscos hjemmeside] *[http://mars.tekkom.dk/cisco/pdf/Cisco_produkt_katalog_september_2009.pdf Cisco product catalog] - Ask your teacher.
 
**Cisco [http://www.cisco.com Ciscos hjemmeside] *[http://mars.tekkom.dk/cisco/pdf/Cisco_produkt_katalog_september_2009.pdf Cisco product catalog] - Ask your teacher.
 
[[Category:CCDA]]
 
[[Category:CCDA]]
Line 58: Line 58:
 
! scope="col" | Description  
 
! scope="col" | Description  
 
|-
 
|-
| Introduktion || Formål og mål for netværks designet
+
| Introduction || describes the project’s purpose and the reasons for the network design.
 
|-
 
|-
| Design krav || Virksomhedens krav og begrænsninger til netværket.
+
| Design Requirements || lists the organization’s requirements, constraints, and goals.
 
|-
 
|-
| Nuværende netværk || Netværkstegninger, hard- og softwareversioner og eksisterende konfigurationer.
+
| Existing Network Infrastructure || includes logical (Layer 3) topology diagrams; physical
 +
topology diagrams; audit results; routing protocols; a summary of applications; a list of
 +
network routers, switches, and other devices; configurations; and a description of issues.
 
|-
 
|-
| Design || Ny logisk topologi, design og IP adresseplaner
+
| Design || contains the specific design information, such as logical and physical topology, IP  
 +
addressing, routing protocols, and security configurations.
 
|-
 
|-
| Proof of Concept || Resultater fra et eventuelt pilotprojekt/FAT (Field Acceptence Test)
+
| Proof of Concept || results from live pilot or prototype testing.
 
|-
 
|-
| Implementations plan || Detaljeret beskrivelse af installationsfasen.
+
| Implementations plan || includes the detailed steps for the network staff to implement the new
 +
installation and changes.
 
|-
 
|-
| Bilag || Support information til virksomheden.
+
| Appendixes || contains additional information and configurations.
 
|}
 
|}
  
= Tegninger over nyt rådhus =
+
 
 +
= Town Hall drawings =
 
{|
 
{|
 
|[[Image:Vkb1.png|left|800px|thumb|]]
 
|[[Image:Vkb1.png|left|800px|thumb|]]

Latest revision as of 14:25, 16 September 2013

Viborg municipality (kommune)

Viborg kommune

Exercise

The new town hall in Viborg are 20.000m2 and have approx. 800 employers.

The council wants a new network and would like a written report covering their new network considering redundancy, security and estimated network speeds.

Facts: Viborg municipality

  • 94.333 residents (2013)
  • Area 1.422 km2 - 3,3% of Denmark
  • Budget more than 4,0 mia. kr.
  • Viborg kommune employers approx. 7.100
  • Approx. 52.000 workplaces
  • 74 Kinder gardens
  • 26 public elementary school, 9 private elementary schools and 7 continuation schools
  • 21 College schools
  • 16 care centers


Exercise details

  • NOTE: Some of the information about Viborg municipality are fabricated, and don't reflect the councils actual network.Henrik Thomsen

Phase 1

  • Closed network to Kommunedata (Estimated 50 Mbps. Uses MPLS) (Kommunedata is a common data center for all danish municipalityes)
  • All employees has access to mail using Outlook or using WEB-mail
  • Want's to use IP telephony
  • WLAN coverage in all buildings
  • 100 directly connected users from home working places. (incl. IP-telefoni) (Closed network)
  • 1100 users with home working places used sometimes. (Cheap solution)
  • 7000 users should have external access to mail and Intranet.
  • Approx. 100.000 citizens should have access to the councils WEB-server(s).
  • Citizen center Viborg: 50 employees (Also VoIP)
  • Citizen Bjeringbro: 10 employees (Also VoIP)
  • Citizen Ørum: 5 employees (Also VoIP)
  • Citizen Møldrup: employees (Also VoIP)
  • Citizen Stoholm: 10 employees (Also VoIP)
  • Citizen Karup: 10 employees (Also VoIP)

Phase 2

  • Connection of schools and all other institutions.

Supplementary information

To solve the exercise you need to make a needs analysis of Viborg municipality needs and demands. Ask your teacher.

  • Information about Service providers

Sektioner i et Design dokument

Sektioner i et design dokument - hvad skal med
Sektion Description
Introduction describes the project’s purpose and the reasons for the network design.
Design Requirements lists the organization’s requirements, constraints, and goals.
Existing Network Infrastructure includes logical (Layer 3) topology diagrams; physical

topology diagrams; audit results; routing protocols; a summary of applications; a list of network routers, switches, and other devices; configurations; and a description of issues.

Design contains the specific design information, such as logical and physical topology, IP

addressing, routing protocols, and security configurations.

Proof of Concept results from live pilot or prototype testing.
Implementations plan includes the detailed steps for the network staff to implement the new

installation and changes.

Appendixes contains additional information and configurations.


Town Hall drawings

Vkb1.png
Vkb2.png
Vkb3.png
Vkb4.png
Vkb5.png

Referencer